>> Home >> Environment >> Effluent management >> Rainwater treatment
Effluent management
Rainwater treatment :
  • The CCIC has equipped itself with several rainwater treatment stations.T
  • he run-off contains sludge (hydrocarbons, engine oils, heavy metals, etc.) and solid matter separated by horizontal flow lamellar settling.
  • This matter is then pumped and treated to avoid any offshore discharge.
  • In September 2004, the first settling tank was installed in the Freight Zone.
  • In July 2006, a second settling tank was installed at Berth 8.
  • In September 2007, a third settling tank was installed at the East Port.
  • In 2008, the CCIC will install two new settling tanks in the Northern Slope zone and at the East South Port.